 |
|
JOMAR's Visual Schedule Board provides extended capabilities for the schedulers to:
|
 |
- achieve better utilization of available production capacity
- enhance the flow of material across processes
|
|
- reduce lead-time at subcontractors and plants
- improve customer services and competitive position
|
 |
Automatic loading by machine group
- Customer Orders
- Planned - Manufacturing Orders
- Released Work Orders
Shop Floor Calendar and Job duration calculations
- Standard weekly schedules with daily overrides for ease of use
- Calendars can be set at the Plant, Department, Machine Group and/or Machine level
- Job duration and end-date algorithm consider downtime for all calendar types and settings
|
|
Scheduling Integration
- ERP, Rough-Cut Capacity Planning and MRP runs
- BOM/Routings, Product and Machine specifications
- Preventive Maintenance Repair schedules can be integrated with Production schedules
- Work Order System
– Printing of shop floor papers and barcoded labels (PDF)
– Production Control and job status reporting
– Workflow Management triggers action messages and E-mail notification
|
|
Additional flexible features for schedulers |

|
- ‘What If’ Scenarios can be developed on multiple Schedule Boards
- Drag and drop a single or group of scheduled work orders
- Dependencies are visually identified and adjusted in a “what if” scenario
- Machine time can be ‘locked-in’ on a customer or order basis
- Timeline can be set in days, hours or half hours
|
|
- Forward and/or Back-Scheduling from ‘Timeline Guide’
- Orders can be split across multiple machines or merged onto a single machine
- Machine and product specs are visible and accessible for online scheduling override
- Search and visibility by top accounts, departments, machine groups, job type
and status
|
 |
 |
 |
Click here for more information on:
Modules
of Enterprise Software Application Suite |
 |
 |
Copyright © 2007, JOMAR
SOFTCORP INTERNATIONAL. All rights reserved.
Website design by Advertech
Design Communications. |